"We expect this to take a while, so please plan to use alternate routes."
Posts published in “Traffic News”
Slick roads were being reported while temperatures were in the mid-20s with localized precipitation.
A similar closure occurred due to protests last weekend.
The section of road has been closed since November 29th due to “excessive slide activity and pavement upheaval at two locations”
The 40-foot wash out occurred as a 12-foot culvert for California Creek failed.
Initial reports from the scene were that both lanes were blocked.
Initial reported as a 6-month project, it is actually a 6-week project.
1 project is expected to reduce a main arterial to a single lane through the summer.
Motorists should plan for single-lane closures and minor delays as a result.







