The involved vehicles were partially blocking a lane on the Birchwood Avenue overpass.
Posts published in “Traffic News”
Northbound and southbound lanes of I-5 at the Nooksack River Bridge are expected to be impacted.
Failure of a steep slope along the north side resulted in significant damage to the roadway.
Motorists are advised to plan ahead and leave earlier if traveling through these areas at these dates and times.
This revision is for utility work associated with the Thornton Street – Vista to Malloy Improvement Project.
A second injury crash occurred in the backup.
Studs wear down road surfaces so removing them helps extend road life.
The closure is needed while crews make guardrail repairs.
Mechanics were reported to be enroute at the time of the announcement.







